phpGrid – PHP Datagrid
     
     
  • Home
  • Gallery
  • Demos
    • Examples
    • Demo Explorer
    • Video Tutorials (new)
  • Documentation
  • Contact Us
  • Get phpGrid Lite (FREE!)
phpGrid – PHP Datagrid
     
  • Home
  • Gallery
  • Demos
    • Examples
    • Demo Explorer
    • Video Tutorials (new)
  • Documentation
  • Contact Us
  • Get phpGrid Lite (FREE!)

Filtered by tag "integration"

PHPGRID IMS
Laravel 10 & Bootstrap 5 Inventory Management with Dashboard, User Management
Introduction This is an expansion of the popular inventory management system tutorial, [...]
gantt with phpgrid
Gantt Chart Integration
  We are constantly experimenting with new frameworks in order to better combine content [...]
Install phpGrid using cPanel
While this tutorial walkthrough shows you how to install phpGrid using web interface of cPanel, [...]
phpgrid phpchart integration
phpGrid, phpChart Integration
  It’s easy to combine phpGrid and phpChart to create a seamless integrated, interactive, [...]
setCallBack
Parameters: $callback_str: callback string Description: Used for pass setting between 3rd party [...]
get_display()
Parameters: $add_script_includeonce: true or false. Whether or not to include script header. [...]
Get My Awesome Grid!
Examples: Getting Started
  • Introduction
  • A Basic PHP Grid Example
  • Work With Different Database Types
  • Local Array Data Source *
  • Data Source: Stored Procedure with IN Paramters
  • JSON Data Source
Examples: Datagrid Properties
  • Datagrid Caption
  • Datagrid Pagination
  • Interactive Datagrid Resizing
Examples: Data Grid Editing
  • Bulk Edit, Select Multiple Rows
  • CELL edit with Add, Delete and Export buttons
  • Composite Primary Key Support *
  • Copy Row
  • CRUD PHP Datagrid (Editable Datagrid) *
  • Customize Edit Form Layout
  • Drag & Drop Rows Between Grids
  • enable_dnd_grouping()
  • Enhance Edit Form
  • Excel Editing
  • Grid Edit Types - Select, Checkbox, Textarea, Autocomplete, WYSIWYG, etc.
  • Inline Edit Actions Column
  • Multiple Editable Grids
  • Nested/Cascade/Dependent Dropdown
  • Row-level Edit Permission
  • Show Remaining Characters in Textarea/Input
  • Tagging with autocomplete
  • Working with Complex Query
  • WYSIWYG editor with font colorpicker
Examples: Set Column Properties
  • Descriptive Column Header
  • Hide Column
  • Set Grid Height and Width
  • Hyperlink Display
  • Display Dynamic URL
  • Data Format Display
  • Image Display
  • Read only fields
  • Required fields
  • Hyperlink to Call JavaScript Function
  • Column Freeze
  • Display Hyperlink From Another Field of The Same Row
  • How to display data from other columns?
Examples: Master Detail
  • Master Detail Grid *
  • Master Detail with Column Alias
  • Subgrid *
  • Master with Multiple Detail Grids *
  • Nested Master Detail Datagrid *
  • Change Master Detail Grids Layout Using CSS
Examples: Search & Export
  • Export Data to Excel, PDF, CSV, and HTML
  • Integrated Search
  • Advanced Search
  • Externalize Search
  • Multiple Fields Global Search *
  • Advanced Search with Date & Number Range Filter
Examples: UI, Data & Grouping
  • Load Data with Vertical Scroll
  • Theme Roller *
  • Column Grouping with Summary *
  • Create Excel-Like, Responsive Grid
  • Horizontal Scroll
  • Column Methods
  • One Table, Multiple Datagrids
  • Column Chooser & Sortable Row
  • Header Grouping
  • Mobile Device Optimized
  • Math (e.g. Sum, Avg, Count) Operation
  • Drag and Drop Grouping
  • Tabbed Grid - Build a DataGrid With Tabs
  • Loading from Large Database Table with 3 Million Records!
Examples: Conditional Output
  • Conditional Value *
  • Conditional Format *
  • Conditional Formatting with Custom Javascript
Examples: Advanced Methods
  • Custom Event Handler
  • Column Property
  • Virtual/Calculated Column
  • Custom Data Validation
  • Column Methods
  • Save Data in Virtual Column
  • Simple Shopping Cart Using the Action Column
Integrated Ajax File Upload
  • PHP Datagrid AJAX File Upload
Examples: Framework Integration
  • phpGrid, Twitter Bootstrap Integration
  • phpGrid Laravel Integration (version 1)
  • phpGrid, Laravel and Bootstrap (version 2)
  • phpGrid and CodeIgniter Integration
  • Integrate with .CSV or Google Spreadsheets
  • phpGrid and Zend Framework Integration
  • phpGrid Now Has Improved IBM DB2 Support!
  • Access DB2 through "ibm_db2" extension
  • Bootstrap Grid Layout
  • Laravel 10 & Bootstrap 5 Inventory Management with Dashboard, User Management
Examples: Date Formatting
  • Complete Date Format Demo (Updated)
  • set_col_datetime()
  • Timepicker Only Support
  • Set Start Day of the Week in Datepicker
Examples: Pivot Grid, Misc.
  • CRUD success/error status display
  • Pivot Grid
  • Display Non-English Characters
  • Locale Setting
Examples: Persist State
  • Bulk Edit, Select Multiple Rows
  • Persist State of the Sort Order and Page On Page Reload
Examples: Form Only
  • Form-Only Edit Mode
  • Enhance Edit Form
  • Load Existing Record into Form (Form-Only Mode)

phpGrid is a product of Kayson Group Inc. Kayson Group creates powerful and easy-to-use PHP components for IT professionals since 2004.

 

Download phpGrid
Recent Posts
  • Announcement – phpGrid v7.6.2

    Announcement – phpGrid v7.6.2

  • phpGrid 7.6.1 Released

  • Understanding Asymmetric Property Visibility in PHP 8.4

    Understanding Asymmetric Property Visibility in PHP 8.4

  • Debugging PHP with VSCode and XDebug: A Step-by-Step Guide

    Debugging PHP with VSCode and XDebug: A Step-by-Step Guide

  • My Simple Hack to Learn 2X Faster

    My Simple Hack to Learn 2X Faster

Contact

Kayson Group Inc.
324 10TH ST STE 211
OAKLAND CA 94607,
USA

 

Hong Kong: 852-30184061
North America: (877)GRID-666

Products People ♥

  • Home
  • Download
  • Blog
  • Examples & Tutorials
  • Documentation
  • OEM
  • T&C
  • Privacy
  • EULA
  • Version History
© 2026 Kayson Group Inc. All rights reserved.

🎉 Querro.io is now open source! – Self-hosted AI text-to-SQL database query • Free forever

Thank You 🙌

Start AI Querying
X